Here is a brief history of the renovation of 31 bis, rue du Faubourg Montmartre. An experience I hope to never go through again in my entire life. The end result is great, but getting there was a lesson in patience.
17 April 2004
Ceiling supports
Supports are being put in the old ceiling to support the new drop ceiling. A laser was used to ensure that the ceiling will be installed evenly.
0 Comments:
Post a Comment
<< Home